Projects Completed By Western Municipal Construction, Inc.

Five Mile Lift Station

Five Mile Lift Station

Date: 2014

Owner City of Billings - 2224 Montana Ave. - Billings, MT 59101

Engineer: Morrison Maierle & Kurtis DeShaw

Contract Amount: $2,094,891

Work Performed: Installation of 1,304 LF of 12-inch force main, 1,073 LF of 24-inch gravity sewer main, lift station and creek bypass.

W.O. 08-25 Chapple Reservoir Expansion

W.O. 08-25 Chapple Reservoir Expansion

Date: 2013

Owner City of Billings - 2224 Montana Ave. - Billings, MT 59101

Engineer: Brown and Caldwell: Jamie Eichenberger

Contract Amount: $5,325,715

Work Performed: Installation of a 2.0 million gallon pre-stressed water storage tank. The work included 50,000 CY of mass excavation, piping, access roads, vaults, manholes, tank aeration mixing system, electrical and controls and site restoration.

Williston ND/Hawthorne Select

Williston ND/Hawthorne Select

Date: 2013

General Contractor: Scott Martin - 16000 North Dallas Parkway - Dallas, TX 75248 - Phone: 214-420-1100

Contract Amount: $2,100,000

Work Performed: Water, sewer and on-site waste-water system and streets for a 74-unit manufactured home park.

Buffalo High Pressure Water Line Project

Buffalo High Pressure Water Line Project

Date: 2012

Owner City of Buffalo, WY - 46 North Main Street - Buffalo, WY 82834 - Phone: 307-684-7335

Engineer:Nelson Engineering

Contract Amount: $836,752

Work Performed: Installation of 4,985 LF of 12-inch PVC water main, 2,159 LF of 8-inch water main, 195 LF of 6-inch water main and appurtenances, furnish and install PRV assembly and street restoration.

East Medicine Lake Project Schedule 1 – Pipeline

East Medicine Lake Project Schedule 1 – Pipeline

Date: 2012

Owner Dry Prairie Rural Water Authority - 5808 Hwy 16 - Culberston, MT 59218 - Phone: 406-787-5382

Engineer:DeWild Grant Reckert and Associates Company

Contract Amount: $4,073,913.70

Work Performed: 96 Miles of buried pipeline, 1 ½” to 14” diameter, service to 90 users, Installation of the East Medicine Lake Package Pump Station.

Lockwood Phase I Sewer Subdistrict 2011-01

Lockwood Phase I Sewer Subdistrict 2011-01

Date: 2012

Owner Lockwood Water and Sewer District - 16440 Old Hardin Road - Billings, MT 59218 - Phone: 406-259-4120

Engineer: Morrison-Maierle, Inc.

Contract Amount: $3,158,862

Work Performed: 15,100 LF of 8” Gravity Sewer and associated manholes and service lines, a lift station and 2,500 LF of 6” force main piping.

Wigwam Rearing Station RFUV Building Additions

Wigwam Rearing Station RFUV Building Additions

Date: 2011

Owner Wyoming Fish and Game Commission - HC 30 Box 2240 - Ten Sleep, MT 82442 - Phone: 307-366-2404

Engineer: Stateline No. 7 Architects

Contract Amount: $562,284

Work Performed: Installation of UV drum filter, two steel frame buildings with miscellaneous underground and process piping.

W.O. 09-13 Staples Redundant Water Main

W.O. 09-13 Staples Redundant Water Main

Date: 2010

Owner City of Billings - PO Box 1178 - Billings, MT 59103

Engineer: Sanderson Stewart

Contract Amount: $1,887,083

Work Performed: 6,365 LF 24” Water Main / 1,012 LF 16” Water Main