Projects Completed By Western Municipal Construction, Inc.

Briarwood Reservoir Expansion

Briarwood Reservoir Expansion

Date: 2016

Owner City of Billings

Engineer: Kadrmas, Lee and Jackson, Inc. (KLJ)

Contract Amount: $3,430,112

Work Performed:The project included construction of a 750,000 gallon pre-stressed concrete water tank, including a foundation of drilled piers. It also included demolition of an existing 180,000 gallon bolted steel water tank and sitework including earthwork, ductile iron water main, PVC water main and erosion control measures.

Five Mile Lift Station

Five Mile Lift Station

Date: 2014

Owner City of Billings - 2224 Montana Ave. - Billings, MT 59101

Engineer: Morrison Maierle & Kurtis DeShaw

Contract Amount: $2,094,891

Work Performed: Installation of 1,304 LF of 12-inch force main, 1,073 LF of 24-inch gravity sewer main, lift station and creek bypass.

W.O. 08-25 Chapple Reservoir Expansion

W.O. 08-25 Chapple Reservoir Expansion

Date: 2013

Owner City of Billings - 2224 Montana Ave. - Billings, MT 59101

Engineer: Brown and Caldwell: Jamie Eichenberger

Contract Amount: $5,325,715

Work Performed: Installation of a 2.0 million gallon pre-stressed water storage tank. The work included 50,000 CY of mass excavation, piping, access roads, vaults, manholes, tank aeration mixing system, electrical and controls and site restoration.

Williston ND/Hawthorne Select

Williston ND/Hawthorne Select

Date: 2013

General Contractor: Scott Martin - 16000 North Dallas Parkway - Dallas, TX 75248 - Phone: 214-420-1100

Contract Amount: $2,100,000

Work Performed: Water, sewer and on-site waste-water system and streets for a 74-unit manufactured home park.

Buffalo High Pressure Water Line Project

Buffalo High Pressure Water Line Project

Date: 2012

Owner City of Buffalo, WY - 46 North Main Street - Buffalo, WY 82834 - Phone: 307-684-7335

Engineer:Nelson Engineering

Contract Amount: $836,752

Work Performed: Installation of 4,985 LF of 12-inch PVC water main, 2,159 LF of 8-inch water main, 195 LF of 6-inch water main and appurtenances, furnish and install PRV assembly and street restoration.

East Medicine Lake Project Schedule 1 – Pipeline

East Medicine Lake Project Schedule 1 – Pipeline

Date: 2012

Owner Dry Prairie Rural Water Authority - 5808 Hwy 16 - Culberston, MT 59218 - Phone: 406-787-5382

Engineer:DeWild Grant Reckert and Associates Company

Contract Amount: $4,073,913.70

Work Performed: 96 Miles of buried pipeline, 1 ½” to 14” diameter, service to 90 users, Installation of the East Medicine Lake Package Pump Station.

Lockwood Phase I Sewer Subdistrict 2011-01

Lockwood Phase I Sewer Subdistrict 2011-01

Date: 2012

Owner Lockwood Water and Sewer District - 16440 Old Hardin Road - Billings, MT 59218 - Phone: 406-259-4120

Engineer: Morrison-Maierle, Inc.

Contract Amount: $3,158,862

Work Performed: 15,100 LF of 8” Gravity Sewer and associated manholes and service lines, a lift station and 2,500 LF of 6” force main piping.

Wigwam Rearing Station RFUV Building Additions

Wigwam Rearing Station RFUV Building Additions

Date: 2011

Owner Wyoming Fish and Game Commission - HC 30 Box 2240 - Ten Sleep, MT 82442 - Phone: 307-366-2404

Engineer: Stateline No. 7 Architects

Contract Amount: $562,284

Work Performed: Installation of UV drum filter, two steel frame buildings with miscellaneous underground and process piping.

W.O. 09-13 Staples Redundant Water Main

W.O. 09-13 Staples Redundant Water Main

Date: 2010

Owner City of Billings - PO Box 1178 - Billings, MT 59103

Engineer: Sanderson Stewart

Contract Amount: $1,887,083

Work Performed: 6,365 LF 24” Water Main / 1,012 LF 16” Water Main